Manufacturing coating

Steelcoat Galvacoat Metalix

“In the end, the target was even exceeded and savings of up to €1,275,687 were made on an annual basis, which equates to a productivity increase of 37% at Steelcoat and a productivity increase of 33% at Metalix. This is equivalent to an R.O.I. from 4:1. The agreed minimum guarantee 1:1 was realized from week 6 of the project.”